PRODUCTS Your present position:Home >> PRODUCTS >> Heater >> Heater TSF-MA
Heater TSF-MA


Origin: Guangdong, China

Brand Name :Topson
Model: TSH-MA

Power (W) :2000

Voltage:230V

Working Area: 20-30㎡

Function:UV Sterillzation/ Air Filter

Feature:Adjustable Thermostat, Overheat Protection

Dimensions :330*190*495mm

Warranty: 1 year
Certification: CB, CE,EMC, GS, ROHS









Zhongshan Topson Electrical Appliances Co., Ltd.
Located:No.6, Jinsan Rd, Sanjiao, Zhongshan City, Guangdong

Province.
Main Products:Mist Fan, Stand Fan, Tower Fan, Table Fan,

Floor Fan, heater, humidifier and air purifier.
Workshop:12000 square meter and 5 production lines.

Certification:ISO9001:2015, BSCI, NOA, BSCI, CE, EMC, LVD,

ROHS, GS, CB, ERP, SAA.
Market:Europe, America, Middle-east and south east Asia.
Full-Automatic motor production lines, using the Japan technology

to manufacture and assembly. To offer the high quality motor of fans.
Professional R&D team, was engaged in the electric fan over 10

years, can be offered the best OEM solutions for different demands.
Looking forward to make the cooperation with you from all over the

world.




Our Service

1. OEM Manufacturing welcome: Product, Package...
2. Sample order.
3. We will reply you for your inquiry in 24 hours.
4. After sending, we will track the products for you once every two

days, until you get the products. When you got the goods,

test them, and give me a feedback. If you have any questions

about the problem, contact with us, we will offer the solve way

for you.

FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you

have legally registered patent,we can pack the goods in your branded boxes after

getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the

products and packages before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The

specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the

molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers

have to pay the sample cost and the courier cost.



[Back]

Relative Goods

Mist Fan, Misting Fan, Water Fan, Water Mist Fan, Water Spray Fan, Water Cooling Fan, Fog Fan, Mist Sprayer, Mist Maker, Air Cooler, Air Cooling Fan